The plan that was on the table was drawn up by the Oudewater Swimming Pool Management Foundation (SBZO). What it comes down to is that a new swimming pool will soon be built where you can go 12 months a year. The municipality is paying 2.5 million euros for the construction of the pool, but that money will be recovered with the sale of the land where the old swimming pool is now, the municipality believes. Houses will be built on the site of the bath. In addition, the municipality must annually deposit about 2.5 tons for the swimming facility.