(Finance) – Un engine problem number 3, one of the four of the first stage of the Space Launch System powered by liquid hydrogen and oxygen, it forced NASA to suspend the countdown for the launch of the Artemis mission 1.TO 40 minutes from “go” scheduled at 14:33 (Italian time) the stop arrived, due to technical problems already known from this morning, and subsequently the launch window was canceled. There next is scheduled for Friday September 2 at 6:48 pm (Italian time). Alternatively, he will try again on September 5th.
On board of the carrier rocket, located on ramp 39B of the Kennedy Space Center, la unmanned Orion capsule destined to orbit the Moon and return to Earth with ditching later 42 days of space flight.