During the renovation, three tunnel tubes remain available, of which one tunnel tube is open in the same direction of travel. Diversion routes will be set up during the work and a maximum speed of 70 kilometers per hour applies. “According to safety regulations, there should never be a traffic jam in the tunnel, so there is a good chance that we will have to meter the traffic in the tunnel,” said Rijkswaterstaat.