According to the Public Prosecution Service (OM), the fact that the speed of section control systems was not previously adjusted to a reduced speed limit during work is that the Galecopper Bridge is located exactly between two cameras. “The desire to adjust the speed has been there before, but that was simply not possible in practice because you have to deal with variable maximum speeds on one route,” said a spokesperson.