(Finance) – Alerion has completed the construction and started the production of two new photovoltaic plants in Romania.
In particular, the construction of two new plants was completed and production started, located in the municipality of Peris (Ilfov Province), each with an installed power of approximately 6 MWp and a total annual production estimated at full capacity of approximately 19 GWh.
With the start-up of these plants, Alerion’s installed power in the photovoltaic sector in Romania exceeds 100 MWp.
(Photo: Vidar Nordli on Unsplash)