Sin Crotone, Pichetto: soon Services Conference for Review Deposit for Reclamation

Hydrogeological instability Pichetto Over 210 million for 59 interventions in

(Finance) – La Service Conference called to decide on the disposal of waste relating to the reclamation of the Since Of Crotone will be convened shortly. The Minister of the Environment and Energy Safety said this, Gilberto Pichetto Fratinduring a question in the Senate on the progress of the reclamation of the Sin di Crotone.

“As known to the questioning, the unique regional authorization provision (PAUR) issued by Region Calabria He prescribed that the waste, produced by the reclamation, were disposed of outside the regional territory – recalled the minister -. However, on the basis of the instructive elements that emerged in the context of the administrative procedures relating to the reclamation project and which have ascertained, with the contribution of various technical subjects and under the aegis of the Calabria Region, the absence of landfills outside the regional territoryDirectorial Decree no. 27 of 2024 “.

The decree authorized the deposit temporary of waste as the only solution to allow the concrete start of the interventions, despite respecting the regional constraints and has imposed the company concerned to continue with the scouting activities of sites possibly useful for the delivery of the waste deriving from the reclamation. At the end of November 2024 Eni Rewind notified that he had selected two companies available to allocate waste to landfills in Sweden and in Germany. The competent structures of the Mase then proceeded to start the review of the directorial decree.

“Finally, it is necessary to report that the Ministry deemed it appropriate to establish a Permanent technical table For the coordination of the remediation procedures of the Sin in question – concluded the minister -. During a recent meeting, convened by the Mase at the Prefecture of Crotone with the administrations concerned, the contents of the memorandum of understanding were agreed, transmitted on 11 March to the interested parties, for the signing, whose objective is to streamline the coordination between the various bodies involved in the management of the waste produced by the reclamation “.

tlb-finance