Catania Airport, Terminal A will be handed over on August 1st

Catania airport terminal A reopening sled

(Tiper Stock Exchange) – Catania Airport will continue to operate with ten flights per hourfive departing and five arriving, which represents the half the capacity of the airport in the ordinary regime and all concentrated in Terminal C.

Sacthe management company of the Fontanarossa airport, communicated that they are fully the structures mounted by the Air Force in the airside are operational, which made it possible to expand the boarding area, thus facilitating operations. Furthermore, the assembly operations are continuing at full speed fourth tensile structure by the logistic personnel of the Air Force in line with the provisions of the Minister of Defence, Guido Crosetto.

The new structure will allow, once completed, the setting up of a real additional terminal. On Sunday 30 July, the X-rays will arrive to set up the check-in and control desks. The “small terminal”which should be fully operational as early as Tuesday, will arrive up to 14 flights every hour7 arriving and 7 departing.

On August 1, Terminal A will be delivered to the Sac, which has already activated for obtain the necessary certifications when open to the public”. In the meantime, the free shuttles to and from the airports of Comiso, Palermo and Trapani have been increased, for those passengers whose flights have been diverted to other airports.

tlb-finance